Factory
Factory and quality control
Capacity, testing and loading — the three numbers a buyer asks for before a first order.
LinesTo be completed
Monthly capacityTo be completed
Floor areaTo be completed
To be completed
Factory data pending: floor area, number of lines, monthly capacity, headcount, key equipment and the third-party audit report.
Control points
01
Incoming material
Clay body and glaze batches checked before production.
02
In-line
Wall thickness, rim profile and drilling checked at the line.
03
Firing
Kiln curve recorded per batch; warpage measured after cooling.
04
Pre-shipment
AQL inspection and drop test on the packed carton.
Send the specification, get a quoted package.
Basins, toilets, smart products, flush plates and vanities — quoted together, loading planned per container.