B2B supply · FOB Shenzhen Yantian · EXW

Wall-hung Basin · Model 9287

Wall hung basin 400mm, model 9287

400 mm rectangular wall-hung basin, 115 mm deep, carried on a wall bracket with a single factory tap hole. Overflow position to be confirmed against the drawing.

400 mm rectangular wall hung basin, model 9287

At a glance

  • 400 × 295 × 115 mm (L × W × D)
  • Rectangular plan, wall-hung format
  • Vitreous china
  • One tap hole, drilled at the factory
  • 0.018 m³ packed volume per piece
  • MOQ 30 pcs per model, per size, per colour

Send this model to us

9287 · 400 × 295 × 115 mm — already on the form.

Specification

Model9287
RangeWall-hung Basins
Series9287
MaterialVitreous china
Dimensions400 × 295 × 115 mm
InstallationWall-hung
MOQ30 pcs per model, per size, per colour
Production lead time30–45 days for a full container
Sample lead timewithin 15 days
IncotermFOB Yantian, Shenzhen · EXW for orders with a forwarder in China

Approval on file

Market statusNo market-specific certificate on file for this model. It is quoted as a standard version, and certification can be arranged against the destination market.
How to verify

Every certificate number can be checked with the issuing body before the order. Scans are sent with the quotation.

Sizes around this one

Widths in this range run from small cloakroom sizes to full-width tops. The two nearest sizes to model 9287 are shown below with their model numbers, so a project can mix widths in one order.

WidthModelDepth
365 mm9272L90 mm
400 mm9287 this page115 mm
435 mm9290140 mm

Container loading

Packed volume for model 9287 is 0.018 m³ per piece. At 28 m³ usable in a 20GP and 68 m³ in a 40HQ, that is about 1,564 pcs and 3,798 pcs respectively.

Calculated from the packed volume in our catalogue. Final quantity depends on the loading plan — we confirm it against the container drawing before booking.

Questions buyers ask about this model

Yes — one tap hole, drilled at the factory to the tap you specify. Ceramic cannot be re-drilled after firing, so send the tap model or the drilling drawing with the order.